    UC Berkeley Wurster Hall Addition, Digital Fabrication Lab

    Status

    Completed, 2014

    Size

    1,500 SF

    Client

    UC Berkeley

    Scope

    Design, Addition

    Project Team

    Mark Cavagnero
    John Fung
    Yun Young Na

    Project Collaborators

    MEP: Engineering 350
    Structural: Jon Brody Engineers
    Geotech: A3GEO, Inc.
    Cost: Mack5

    Description

    This project on the University of California, Berkeley campus expands the existing architectural shop in Wurster Hall for use as a CAD/CAM laboratory for the College of Environmental Design students and faculty. The addition, which houses computer numerical controlled (CNC) routers, laser cutters and 3-D printers, utilizes the footprint and existing concrete walls of a 1500-square-foot courtyard adjacent to the existing architectural shop in Wurster Hall. 

    The addition is respectful of the design of the existing building. The new roof and east side wall are clad in stainless steel, a visual counterpoint to the heavy concrete construction of Wurster Hall.  The new roof is supported by an independent structural system above the existing concrete walls to allow a band of clerestory windows to draw daylight into the work spaces. The addition is offset five feet from the existing building to let daylight permeate the new spaces from all sides while maintaining natural light levels in the existing building. 

    In an effort to respond to a tight budget and build sustainably, the chosen materials serve double functions; the structural slab is the finished floor, the structural deck is exposed and reduces noise from the equipment and the exposed concrete walls also damper the sound and offer thermal mass for temperature control. Interior glass walls provide sound isolation for the various pieces of equipment within the lab while maintaining an overall feel of one larger contiguous space.